The company held a 2017 performance evaluation mobilization meeting
On March 16th, the 2017 performance evaluation mobilization meeting of the company was held in Jinhai, Jiangsu. Mr. Shi Hui, Deputy General Manager of the company, attended the meeting and delivered a speech. Zhou Guojun, Deputy Director of the Administrative Management Center of the company, mobilized and deployed the performance evaluation management work of the company in 2017, and provided a detailed introduction to the implementation plan and basic process of the performance evaluation.
Starting from this year, the company will strictly follow the requirements of the Performance Appraisal Management Measures (Trial) to conduct performance evaluations on all departments and subsidiaries of the company. The assessment will highlight key points, scientifically group and classify them; Clear content and reasonable score; Unified leadership, hierarchical responsibility, and further strengthening supervision and management, eliminating the drawbacks of "doing more and doing less, doing well and doing bad" from a ideological perspective, fully utilizing performance evaluation to mobilize and unleash everyone's enthusiasm, stimulate employee vitality, improve work quality, and promote the good development of corporate culture.
Lu Ping, Deputy Director of the Quality Center, Huang Zhangyu, Deputy Director of the R&D Center, Mao Zhiqiang, Director of Baotou Factory, Qiao Jun, Deputy Director of Jiangsu Factory, and heads and management personnel of various functional departments attended the meeting.
*Some documents are sourced from the internet. If there is any infringement, please contact the website to delete them
- ● Jinhai Corporation and CRRC Qishuyan Institute had a discussion and exchange[2024-11-29]
- ● Talking about 'new' voices and attending the 2024 New College Student Symposium at Xincheng Jinhai Co., Ltd[2024-11-29]
- ● Wind power hybrid tower industry factory production capacity evaluation continues - Zhonghan Energy Baotou Production Base[2024-11-16]
- ● Research on Defects and Reinforcement Repair Technology of Wind Power Concrete Tower Structure[2024-11-16]
- ● 2024 Wind Power Hybrid Tower Industry Factory Capability Evaluation Results Released - Zhonghan Energy (Shanghai) Co., Ltd. - Baotou Production Base[2024-11-16]
- ● The 2024 Jinhai Wind Power Truss Tower Promotion Conference and Technical Seminar were successfully held[2024-11-11]
- ● Segmented straight tower prestressed concrete tower | Inner Mongolia Jinhai New Energy Technology Co., Ltd[2024-10-30]
- ● Peng Ke, Chairman of Jinhai Group, led a team to visit the First Aviation Administration for exchange[2024-10-26]
- ● Inner Mongolia Jinhai New Energy Technology Co., Ltd. - Gulang Production Base conducted an on-site evaluation of the production capacity of wind power hybrid tower industry factories for 2024, and the results were publicly announced[2024-10-26]
- ● Jinhai Co., Ltd. was invited to attend the Fourth President's Meeting and the Second First Member's Meeting of the Wind Power Engineering Branch of the China Electric Power Construction Enterprise Association[2024-10-18]