- Jinhai Shares
- Jinhai Microenterprise
- Mobile QR code
Recommend cutting-edge information about companies and industries to you
On the afternoon of July 14th, there was light rain in the sky. The Jingye Bearing Project, which is currently under construction and located in the Wind Power Industry Park of Funing County, did not stop due to the rain. More than 130 workers were busy cleaning up the newly completed factory building; Or multiple high-tech equipment may be installed... It is expected that in less than half a month, this domestic enterprise, which is the first to independently develop and produce large-scale offshore wind turbine bearings, will be completed and put into operation. At that time, another "section" will be added to the wind power equipment industry chain in the county.
It is understood that in areas with concentrated wind power in the "Three North" regions of China, wind curtailment is quite common. Yancheng's wind power, photovoltaic and other new energy sources account for 70% of Jiangsu's total. The development of new energy along the coast and local production and consumption have shown enormous advantages and potential in Yancheng. In the first seven months of this year, Yancheng's completed power supply and sales increased by 22.47% and 24.03% year-on-year, respectively, ranking first in the province.
Dongtai: A batch of key projects, including offshore wind power manufacturing, have started construction with a total investment of 2.025 billion yuan
Since the beginning of this year, the Yandu Quality Supervision Bureau of Yancheng City has closely focused on the government's central work and actively served the application work of the National Energy and Wind Power Technology Equipment Evaluation Center, a "triple" project in the city. The bureau has strengthened communication and coordination with the district government, Yancheng Quality Supervision Bureau, and the Municipal Quality Inspection Institute, fully integrating and leveraging the resource advantages of the quality supervision system, and fully launching the application work of the National Energy and Wind Power Technology Equipment Evaluation Center.
The invention patent "flange components, connecting flanges and their assembly methods" applied by Inner Mongolia Jinhai New Energy Technology Co., Ltd. in the United States has been authorized by the United States. This patent was accepted in November 2009 and lasted for 4 years. It was granted in September 2012 with US patent number 12/524319 (China PCT/CN2006/071012). International patent applications, also known as PCT. If an invention or creation is to be protected by a patent in another country, it must be applied for in the country or region where it is intended to be protected. The right to grant a patent belongs to the patent management department of that country.
Jiangsu Jinhai New Energy Company is a key wind power equipment project under construction in the Funing Wind Power Equipment Industrial Park this year. It uses independently developed production equipment to develop and produce a new type of reverse balance flange. This research and development product fills the gap in the domestic industry. Compared with ordinary flanges, it not only saves production costs by 30%, but also saves operation and maintenance costs by more than 35% for wind power investors.
In recent years, Funing County, Jiangsu Province has set the goal of building a "China Wind Power Equipment City" by prioritizing the development of key components and then focusing on breakthroughs in high-power wind power assembly projects. It has focused on attracting upstream and downstream industrial chain projects from the Fortune Global 500 and the top five domestic companies, striving to break through core technologies and form an industrial cluster. As of now, large state-owned enterprises such as Sinoma Technology, as well as leading domestic wind power industry enterprises such as Dongqi Group and Goldwind Technology, have settled in the park, forming a relatively long industrial chain of 9 projects, including wind turbine blades, towers, control systems, bolts, flanges, bearings, new materials for blades, final assembly, and stator rotor.