Secretary Qian and Vice President Sun visited to provide guidance
On July 10, 2013, Mr. Qian Suoming, Secretary of the Party Committee and Deputy General Manager of China Three Gorges New Energy Company, Mr. Sun Qiang, Deputy General Manager, and other leaders came to Jiangsu Jinhai New Energy Technology Co., Ltd. to provide guidance on work, and were warmly welcomed by our employees.
After arriving at Jinhai Company, Secretary Qian and Vice President Sun and their delegation first entered the workshop for a visit, accompanied by General Manager Yang Zhou and the main leaders of Funing County Government and Development Zone. During the visit, Secretary Qian and Vice President Sun had a detailed understanding of the production situation in the workshop.
Secretary Qian (second from the right), Vice President Sun Qiang (first from the left), Mayor of Funing County Gu Yunling (first from the right), and General Manager Yang (second from the left)
Understanding the product
Communication guidance
Secretary Qian and Vice President Sun are particularly concerned about the production progress of the newly established Jinhai Solar Energy Business Unit, and succinctly point out that we must strictly control the quality of solar brackets so that Jinhai Company can develop better and faster.
*Some documents are sourced from the internet. If there is any infringement, please contact the website to delete them
- ● Jinhai Corporation and CRRC Qishuyan Institute had a discussion and exchange[2024-11-29]
- ● Talking about 'new' voices and attending the 2024 New College Student Symposium at Xincheng Jinhai Co., Ltd[2024-11-29]
- ● Wind power hybrid tower industry factory production capacity evaluation continues - Zhonghan Energy Baotou Production Base[2024-11-16]
- ● Research on Defects and Reinforcement Repair Technology of Wind Power Concrete Tower Structure[2024-11-16]
- ● 2024 Wind Power Hybrid Tower Industry Factory Capability Evaluation Results Released - Zhonghan Energy (Shanghai) Co., Ltd. - Baotou Production Base[2024-11-16]
- ● The 2024 Jinhai Wind Power Truss Tower Promotion Conference and Technical Seminar were successfully held[2024-11-11]
- ● Segmented straight tower prestressed concrete tower | Inner Mongolia Jinhai New Energy Technology Co., Ltd[2024-10-30]
- ● Peng Ke, Chairman of Jinhai Group, led a team to visit the First Aviation Administration for exchange[2024-10-26]
- ● Inner Mongolia Jinhai New Energy Technology Co., Ltd. - Gulang Production Base conducted an on-site evaluation of the production capacity of wind power hybrid tower industry factories for 2024, and the results were publicly announced[2024-10-26]
- ● Jinhai Co., Ltd. was invited to attend the Fourth President's Meeting and the Second First Member's Meeting of the Wind Power Engineering Branch of the China Electric Power Construction Enterprise Association[2024-10-18]