2013 company fire drill report
In order to strengthen the production safety of enterprises, enhance the fire safety awareness of employees, improve their ability to respond to emergencies, and correctly master the use of fire extinguishers and methods of extinguishing fires, Jiangsu Jinhai New Energy Technology Co., Ltd. successfully held a fire drill on the afternoon of July 11, 2013.
This fire drill was one of the "Safety Production Month" activities of Jinhai Company in 2013. In order to highlight the theme of "strengthening safety foundation and promoting safety development", the company's safety production leadership group, production department, and comprehensive department carefully planned the exercise plan based on the company's actual situation. They received strong support from the Funing County Safety Supervision Bureau and Fire Brigade, providing practical guarantees for the successful exercise.
Before the official start of the exercise, the fire brigade provided fire safety knowledge training to all employees, covering daily fire safety knowledge, evacuation and self rescue knowledge in the event of a fire, as well as the use of fire extinguishers. Detailed explanations were provided to supplement the necessary knowledge that some employees lacked in fire safety, further improving their prevention awareness and emergency self rescue ability, and achieving good results.
At 4:30 pm, the on-site fire emergency drill officially began. Although the weather is hot, the employees are enthusiastic and actively involved. Chief Engineer Shi Hui conducted on-site command, and personnel from various departments cooperated according to the predetermined plan. All employees jointly experienced the discovery of a fire, personnel evacuation, evacuation and external communication, use of fire-fighting equipment, handling of important materials, and first aid for injured personnel on site. The entire firefighting scene was tense and orderly, meeting the rehearsal requirements, and the fire was successfully extinguished.
This fire drill activity has enhanced the fire safety awareness of all employees and improved their ability to respond and control sudden accidents such as fires. We have achieved good results throughout the company, increasing the awareness of the importance of safety production among our employees. The expected goal was achieved and the fire drill was a complete success.
Carefully listen to fire safety knowledge training
Exercise first aid for injured personnel
Firefighters fighting on site
Teach about the correct use of fire-fighting equipment
Practice the correct use of fire extinguishers
*Some documents are sourced from the internet. If there is any infringement, please contact the website to delete them
- ● Jinhai Corporation and CRRC Qishuyan Institute had a discussion and exchange[2024-11-29]
- ● Talking about 'new' voices and attending the 2024 New College Student Symposium at Xincheng Jinhai Co., Ltd[2024-11-29]
- ● Wind power hybrid tower industry factory production capacity evaluation continues - Zhonghan Energy Baotou Production Base[2024-11-16]
- ● Research on Defects and Reinforcement Repair Technology of Wind Power Concrete Tower Structure[2024-11-16]
- ● 2024 Wind Power Hybrid Tower Industry Factory Capability Evaluation Results Released - Zhonghan Energy (Shanghai) Co., Ltd. - Baotou Production Base[2024-11-16]
- ● The 2024 Jinhai Wind Power Truss Tower Promotion Conference and Technical Seminar were successfully held[2024-11-11]
- ● Segmented straight tower prestressed concrete tower | Inner Mongolia Jinhai New Energy Technology Co., Ltd[2024-10-30]
- ● Peng Ke, Chairman of Jinhai Group, led a team to visit the First Aviation Administration for exchange[2024-10-26]
- ● Inner Mongolia Jinhai New Energy Technology Co., Ltd. - Gulang Production Base conducted an on-site evaluation of the production capacity of wind power hybrid tower industry factories for 2024, and the results were publicly announced[2024-10-26]
- ● Jinhai Co., Ltd. was invited to attend the Fourth President's Meeting and the Second First Member's Meeting of the Wind Power Engineering Branch of the China Electric Power Construction Enterprise Association[2024-10-18]