Jinhai Shares Holds Second Quarter Technical Exchange Meeting
On May 10th, the Architectural Design and Research Institute of Tongji University, Tongji Jinhai Wind Power Structure Research and Development Center, and Inner Mongolia Jinhai New Energy Technology Co., Ltd. held a technical exchange meeting for the second quarter of 2021 in Shanghai. Professors Ma Renle, He Minjuan, He Guirong from Tongji University, as well as Yang Zhou, Chairman and General Manager of Jinhai Group, attended the conference to jointly look forward to the future of the industry and promote the technological development of reverse balance flanges, prestressed anchor bolt assemblies, and prefabricated prestressed concrete wind turbine tower products. The meeting was chaired by Shi Hui, Deputy General Manager of Jinhai Group.
In the exchange meeting, based on the principles of openness and cooperation, everyone conducted an in-depth analysis of the problems existing in the application of the company's products in wind power projects. They proposed solutions to related application problems such as technological upgrading of old wind power projects, improvement testing of reverse balance flange welding process, welding technology for flange plate and cylinder section connection, welding technology for flange plate and stiffening plate connection, and bolt overtensioning technology. They also put forward requirements and deployments for future work.
This exchange meeting fully affirmed the numerous excellent achievements jointly achieved by Jinhai Group and Tongji University through close cooperation, laying a certain foundation for building the Jinhai brand. There is still room for improvement in technological cooperation. We need to further strengthen technological exchanges, leverage our respective strengths, exchange and complement resources, and provide services to actively respond to the national carbon peak and carbon neutrality strategies, further enhancing the company's market competitiveness.
Leaders from relevant units and departments such as Tongji University, Tongji Jinhai Wind Power Structure Research and Development Center, and Jinhai Corporation attended the exchange meeting.
*Some documents are sourced from the internet. If there is any infringement, please contact the website to delete them
- ● Jinhai Corporation and CRRC Qishuyan Institute had a discussion and exchange[2024-11-29]
- ● Talking about 'new' voices and attending the 2024 New College Student Symposium at Xincheng Jinhai Co., Ltd[2024-11-29]
- ● Wind power hybrid tower industry factory production capacity evaluation continues - Zhonghan Energy Baotou Production Base[2024-11-16]
- ● Research on Defects and Reinforcement Repair Technology of Wind Power Concrete Tower Structure[2024-11-16]
- ● 2024 Wind Power Hybrid Tower Industry Factory Capability Evaluation Results Released - Zhonghan Energy (Shanghai) Co., Ltd. - Baotou Production Base[2024-11-16]
- ● The 2024 Jinhai Wind Power Truss Tower Promotion Conference and Technical Seminar were successfully held[2024-11-11]
- ● Segmented straight tower prestressed concrete tower | Inner Mongolia Jinhai New Energy Technology Co., Ltd[2024-10-30]
- ● Peng Ke, Chairman of Jinhai Group, led a team to visit the First Aviation Administration for exchange[2024-10-26]
- ● Inner Mongolia Jinhai New Energy Technology Co., Ltd. - Gulang Production Base conducted an on-site evaluation of the production capacity of wind power hybrid tower industry factories for 2024, and the results were publicly announced[2024-10-26]
- ● Jinhai Co., Ltd. was invited to attend the Fourth President's Meeting and the Second First Member's Meeting of the Wind Power Engineering Branch of the China Electric Power Construction Enterprise Association[2024-10-18]