50MW Jieyuan Shandong Dan County Project
Project Name: 50MW Jieyuan Shandong Dan County Project
Product: Segmented straight tower fully prestressed steel-concrete tower
Quantity: 15 units
Single unit capacity: 3.0MW
Tower height: 140M
Mixed tower height: 108M
Steel tower height: 32M
Project Overview: The Donggouhe Phase I project in Shan County, Shandong Province is the first wind power project in China with a 140m mixed tower supporting a 3MW wind turbine. The project is planned to have an installed capacity of 50MW. Using 15 Mingyang Intelligent MySE 3.2-145 fans, all using the 140m high mixed tower scheme manufactured by Jinhai Group, the lower concrete section is 108m high, and the upper steel tower section is 32m high.